Case Study: Dighton Power ProjectLocated in Dighton, Massachusetts, this 200 MW combined cycle plant was placed into commercial operation in 1999 To meet cold weather, low noise and other considerations, this plant features an ACC system comprised of 8 cells. Due to a very constricted site, a uniqe ducting system from the turbine building to the ACC was used.
|
|||||