Case Study: Jasper CountyThis 875 MW combined cycle plant is located in Hardeeville, South Carolina. The plant was placed into commercial operation in 2004. As the owner of this plant has historically had fouling problems with film fills, GEA's NF-20 modular splash fill was provided in a non-fouling, yet high efficiency design. In addition to the main, 11-cell fiberglass cooling tower, GEA constructed a 3-cell cooling tower for use with the turbine inlet air chilling system. Both towers featured similar designs and utilized GEA's NF-20 modular splash fill.
|
|||||